<tfoot id="2w0w4"><noscript id="2w0w4"></noscript></tfoot>
  • <nav id="2w0w4"><code id="2w0w4"></code></nav>
  • <noscript id="2w0w4"><dd id="2w0w4"></dd></noscript>
  • <tr id="2w0w4"><small id="2w0w4"></small></tr>
      <sup id="2w0w4"><ul id="2w0w4"></ul></sup>
      <sup id="2w0w4"></sup>
      <noscript id="2w0w4"><optgroup id="2w0w4"></optgroup></noscript>
    • <sup id="2w0w4"></sup>
    • 
      
      <code id="2w0w4"><delect id="2w0w4"></delect></code>
    • 久热香蕉在线视频免费大,中文字幕在线亚洲日韩6页,殴美精品一区二区三区,精品自拍视频无码免费,五月丁香综合缴情网,a级毛片18以上观看免费网站

      News
      Your location:Home > News > Industry news

      Connection between fault recorder and IEC61850 protocol converter

      AddTime:2021-12-07 14:33:26   Views:     【 Big Mid Small 】   Print   Close

             In the intelligent substation, in case of system abnormality or fault, in addition to recording and analyzing the original network message, it is also necessary to analyze the network message and restore it to the records of primary equipment fault waveform and secondary equipment action events of the power system, so as to facilitate the analysis and rapid search of fault causes after the accident. The health status of the network is an important factor affecting the normal operation of the whole substation system. Therefore, in addition to recording the operation status and protection action behavior of the power grid, the intelligent substation also needs to monitor and record the communication status of the network, so as to analyze the causes of power grid faults from different levels.

              The communication of intelligent substation applies IEC61850 standard, and various functions share a unified information platform, which strengthens the interoperability of equipment and avoids repeated input of equipment. The information transmission channel can be self checked with high reliability, which is easy to realize management automation.

              In this way, we know that the intelligent substation is based on IEC61850 communication standard, that is, the electrical equipment in the intelligent substation needs to comply with IEC61850 communication standard, and the equipment that fails to meet the requirements needs to install IEC61850 protocol converter to meet the requirements. Similarly, If the fault recording device cannot meet the IEC61850 communication standard, it also needs to install a protocol converter to be applied to the intelligent station.


      Prev:Power system communication protocol is unified by protocol converter  Next:What problems can the on-line power quality monitoring device solve
      Back To Top
      Copyright ? Bao Ding Shi Simaier Electric Co., Ltd. All Rights Reserved  
      久热香蕉在线视频免费大
      <tfoot id="2w0w4"><noscript id="2w0w4"></noscript></tfoot>
    • <nav id="2w0w4"><code id="2w0w4"></code></nav>
    • <noscript id="2w0w4"><dd id="2w0w4"></dd></noscript>
    • <tr id="2w0w4"><small id="2w0w4"></small></tr>
        <sup id="2w0w4"><ul id="2w0w4"></ul></sup>
        <sup id="2w0w4"></sup>
        <noscript id="2w0w4"><optgroup id="2w0w4"></optgroup></noscript>
      • <sup id="2w0w4"></sup>
      • 
        
        <code id="2w0w4"><delect id="2w0w4"></delect></code>