<tfoot id="2w0w4"><noscript id="2w0w4"></noscript></tfoot>
  • <nav id="2w0w4"><code id="2w0w4"></code></nav>
  • <noscript id="2w0w4"><dd id="2w0w4"></dd></noscript>
  • <tr id="2w0w4"><small id="2w0w4"></small></tr>
      <sup id="2w0w4"><ul id="2w0w4"></ul></sup>
      <sup id="2w0w4"></sup>
      <noscript id="2w0w4"><optgroup id="2w0w4"></optgroup></noscript>
    • <sup id="2w0w4"></sup>
    • 
      
      <code id="2w0w4"><delect id="2w0w4"></delect></code>
    • 久热香蕉在线视频免费大,中文字幕在线亚洲日韩6页,殴美精品一区二区三区,精品自拍视频无码免费,五月丁香综合缴情网,a级毛片18以上观看免费网站

      News
      Your location:Home > News > Industry news

      Necessity of installing small current grounding line selection device

      AddTime:2022-10-27 16:36:58   Views:     【 Big Mid Small 】   Print   Close

      For production enterprises, the continuity, reliability and security of power supply are very important. If power failure occurs, it will cause unpredictable losses to the normal production of enterprises.

      In the normal operation of the substation, single-phase ground fault occurs frequently. According to the electric power regulations, single-phase ground fault can operate with fault for 2 hours. However, single-phase ground fault will cause the normal phase voltage to rise, which may lead to insulation breakdown and fault expansion, even to interphase short circuit, causing greater harm to the safety of system operation. Therefore, it is necessary to quickly find out the fault line and eliminate it.

      However, for some substations, there are many outgoing lines of 10KV and 35KV, and the original design did not design and install a small current grounding line selection device. When a fault occurs, the operation and maintenance personnel cannot find which circuit outgoing line single-phase grounding fault in time, let alone go further and remove the fault; It brings some blindness to the operators, so it is necessary to add small current grounding line selection device to this substation.


      Prev:The arc light protection system can be tested after installation  Next:Main factors of insufficient principle of low current grounding line selection
      Back To Top
      Copyright ? Bao Ding Shi Simaier Electric Co., Ltd. All Rights Reserved  
      久热香蕉在线视频免费大
      <tfoot id="2w0w4"><noscript id="2w0w4"></noscript></tfoot>
    • <nav id="2w0w4"><code id="2w0w4"></code></nav>
    • <noscript id="2w0w4"><dd id="2w0w4"></dd></noscript>
    • <tr id="2w0w4"><small id="2w0w4"></small></tr>
        <sup id="2w0w4"><ul id="2w0w4"></ul></sup>
        <sup id="2w0w4"></sup>
        <noscript id="2w0w4"><optgroup id="2w0w4"></optgroup></noscript>
      • <sup id="2w0w4"></sup>
      • 
        
        <code id="2w0w4"><delect id="2w0w4"></delect></code>